Tell us the project, your part in it and where it stands, and see what we do for you there.
Builder, houses and townhomes, design and pricing: 3 tools.
Builder
The tools for this stage
- Draw a houseYoursSend a brief, and get a code-checked drawing set and an exact materials order back.
- Quote levelingYoursLevel your subcontractors' quotes against the drawings' quantities, so a quote that leaves out scope shows it.
- Plan libraryYoursYour plans are kept here, ready to build again on a new lot.
Sources, 9
- 1Fixr, Draftsman cost, January 31, 2025. What a drafter charges for a set of house plans in the US, about $2,000 on average for semi-custom plans of a 2,000 sq ft, two-story, 3 bedroom, 2 bath home. Fully custom plans run $2,000 to $20,000. A consumer cost guide, national figures.
- 2XYZ Blueprint benchmark, 3,168 houses, November 21, 2026. Each of 3,168 houses (1,152 one-story, 1,152 two-story and 864 townhome buildings, under both code editions) was timed once on a laptop (AMD Ryzen 7 5700U with Radeon Graphics (16 threads), 15 GB memory, Windows 11 Home, Node v24.11.1), from the confirmed program to the full drawing set, code review and materials order; reading your brief and your browser drawing the sheets are not in this time. Savings compare each order line with the allowance a builder would usually add for that material, as our takeoff assumes it (a builder's own will differ), and count a line where the exact layout needs more as a loss. Prices are the takeoff's planning prices for Tampa Bay, not quotes. The test count is the number of written tests in our checks, all run before every push.
- 3AACE International, Recommended Practice 56R-08, Cost Estimate Classification System for the Building and General Construction Industries, August 7, 2020. How far a cost estimate made by square-foot factoring (a Class 5 estimate) is expected to land from the actual cost, at 80% confidence, in building construction, residential included.
- 4Florida Statutes, section 553.792 (2026), 2026. What one round of corrections can add to a Florida house permit: the applicant has 10 business days to answer the department's written comments, and the department then has 10 business days to review the answer.
- 5PlanGrid and FMI, Construction Disconnected (2018 industry report), 2018. US construction spending that went to rework in 2018: $65 billion of the $1,304 billion forecast in the same report (the percent is our arithmetic). A survey of 599 construction leaders, 500 of them in the US and over half in commercial building, none listed as residential, by PlanGrid, a software maker, and FMI.
- 6PlanGrid and FMI, Construction Disconnected (2018 industry report), 2018. Time construction professionals said they spend each week on work that does not move the job forward, 35% of their hours: 5.5 hours looking for project data, 4.7 resolving conflicts and 3.9 dealing with mistakes and rework. Same survey.
- 7PlanGrid and FMI, Construction Disconnected (2018 industry report), 2018. Share of rework caused by poor project data and miscommunication, worldwide; in the US that came to $31.3 billion in 2018. Same survey.
- 8Florida Statutes, section 553.792 (2026), 2026. How long a Florida building department may take to approve, approve with conditions or deny a complete permit application for a single-family home under 7,500 sq ft (60 business days at 7,500 sq ft or more). It must flag a missing item within 5 business days. Late reviews cut the permit fee 10% a business day.
- 9NAHB, Government Regulation in the Price of a New Home: 2026 (Eric Lynch), June 8, 2026. How long regulation delays a land development project on average, as reported by the 94.2% of developers who said it causes delay; 93.4% of builders reported regulatory delays during construction too, averaging a little over six weeks.