Skip to content

We find, draw and price houses for the people who build them.

Tell us about a lot and the house you want on it. We find what fits, draw it, check it, price it and keep the paperwork straight while it is built.

Free to try, with no account.

  1. The lot it stands onWe check which houses fit a lot before you buy it. 44 of our plans fit this one.XYZ Realtor
  2. The house itselfDrawn in 19 sheets and checked against the building code, ready for an engineer to seal.XYZ Blueprint
  3. Everything to build it145 items, $143,664 in materials. Every quote and payment is held to this list.XYZ GC

Point at a number, or tap it, to see that part of the house.

One house, from an empty lot to the last payment.

Each step has its own site, and the same house passes from one to the next, so nothing is typed twice.

  1. Step 1 of 4

    Find the lot

    Give us a lot's size or its address. We show every house that fits inside its building lines, and what each would cost to build.

    Open XYZ Realtor
    STREET (RIGHT OF WAY)5' SIDEWALKBUILDING SETBACK LINEPROPOSED 1-STORY RESIDENCEFFE 101.68 (local datum, see C-101)COV. LANAIA/C25'-0"35'-0"9'-10"9'-10"75'-0"120'-0"N1SITE PLAN1/8" = 1'-0"Scale 1/8" = 1'-0"SITE DATAITEMLotLot areaBuilding footprintLot coverageImpervious (est.)Setbacks req. F/S/RProvided F/S/RFront facesFlood zoneCountyVALUE75' x 120'9,000 sq ft2,848 sq ft31.6%3,407 sq ft25' / 7.5' / 20'25'-0" / 9'-10" / 35'-0"South (180°)XHillsboroughSITE NOTES1.Lot lines, setbacks and zoning district tobe confirmed by a Florida-licensed surveyorand the local zoning code.2.Grade away from the house at least 6 inwithin the first 10 ft (FBC-R R401.3).Drainage arrows show flow to the street andswales.3.Finished floor 101.68 on the assumed localdatum (road crown 100.00), about 20 in abovethe crown, set by drainage on C-101; garagefloor 2 in below house floor. Finalelevations NAVD88 per the survey.4.FIRM panel number and effective date,easements and the legal description per thesealed survey.5.Building height 22'-6" from finish grade tothe ridge; check the zoning district limit(35 ft is typical for single-family).6.Foundation: monolithic slab on grade withthickened edge (S-101). Driveway and walk: 4in concrete on a compacted base.7.Right-of-way use permit for the drivewayapron and any work in the right-of-way.Vacant lot assumed: no demolition; existingconditions and trees per the survey.8.Driveway and walks are shown for permitlayout. Final grading and drainage by civilengineer where required.9.Flood zone X. No flood elevation requirementunder FBC-R R322.10.A/C condenser on a 3 in pad, anchored forwind per the engineer of record.
  2. Step 2 of 4

    Draw the house

    Describe the house in a few lines. We draw all 19 sheets, run 28 code checks, and a licensed engineer reviews and seals the set.

    Open XYZ Blueprint
  3. Step 3 of 4

    Price it

    We count every item it takes to build, by trade. This house comes to $143,664 in materials.

    Price a house

    Materials by trade

    $143,664

    • Doors and windows$22,405
    • Wood and framing$18,858
    • Roofing, insulation, stucco$16,660
    • Finishes$15,966
    • Concrete$13,280
    • HVAC$11,179
    • Cabinets and countertops$9,116
  4. Step 4 of 4

    Build it

    Send us your quotes, changes and payment paperwork. We check each one against the house, so nothing is left out and nothing is paid twice.

    Open XYZ GC

    Lien waivers, draw 3

    $291,800 open

    • Gulf Line Builders Inc.not back yet
    • Sandpiper Concrete LLCnot back yet
    • Osprey Electric Inc.not back yet

    0 of 3 waivers back, each in the statute's own wording.

You send it. We do the work and hand it back.

You do not learn a new program. You send what you already have.

  • You send: A lot's size, or its address

    We hand back: Every house that fits on it, and what each costs to build

    On the sample lot, 44 plans fit.

  • You send: A few lines, a sketch or a PDF of the house

    We hand back: The full drawings, the code check and the materials list, sealed by an engineer

    19 sheets, 28 checks and 145 items for the sample house.

  • You send: Your subcontractors' quotes

    We hand back: A side-by-side table showing what each one left out, in dollars

  • You send: A change the owner wants

    We hand back: What it adds to the price, how many days, and which drawings change

We measured it, so you do not have to take our word.

36 milliseconds

The usual time to draw, check and price a whole house once you confirm the brief.

Timed on 3,168 houses.

25 of 28

Code checks the sample house passes on its own. The rest go to the engineer.

Run on the sample house.

1,107 tests

Every change runs 400 different houses through these before it reaches you.

Run on every change, by our own checks.

Ask for it from your AI assistant.

The same engines answer inside Claude, ChatGPT and other assistants, so the numbers match what you see here.

Draw a one-story house with 4 bedrooms and 2 baths, about 2,100 sq ft, and tell me what it takes to build.

Used XYZ: draw a house, then its materials order

Here is the house. It is drawn in 19 sheets, it passes 25 of its 28 code checks on its own, and its materials come to $143,664.

Drawings
19 sheets
Code checks
25 pass, 3 for the engineer
Materials
145 items
Materials cost
$143,664
How to connect it

We are a small team in Tampa, Florida.

We started with the drawings, because every other step of a house waits on them. A person answers when you write.

Start where you are.

Each of these is free to try, with no account.